Asbestos Surveys & Testing in Newport Cardiff & Bristol

Asbestos Surveys and Testing Newport, Bristol and Cardiff

Checkatrade
Environment Agency
Safe Contractor Approved
Bark Elite Pro
ISO Certified Company
trustatrader

Asbestos Testing Management Plans

The purpose of asbestos management is to prevent the exposure to airborne asbestos now and for the duration of the time asbestos containing materials (ACMs) are present on your premises.

To do this you must identify the person within your organisation that will be responsible for that management. The designated duty holder must put in place a written asbestos management plan which will include an asbestos register. This register should include the location and conditions of the ACMs.

We can provide you with a tailor made management plan for your premises or organisation this can also include a fully controlled online E-Management system with various levels of access for security purposes. We also offer a full sample inspection regime whereby we track the asbestos in our client’s properties and monitor the condition of these materials and provide regular reports.

Asbestos Management Surveys

If you occupy a building for the purpose of just using it as an office then this is the survey for you. Management surveys will look at building materials that occupiers are likely to come into contact with. A good management survey will also take into account light maintenance tasks that will need to be undertaken. A management survey will also list where asbestos is present and assign priority assessments so that materials can be prioritised. The findings from this survey will go into a long term management strategy.

This survey will not look too hard into the building fabric. If you are undertaking a refurbishment project at a later date this survey will not be enough, you will need to undertake a refurbishment survey (ONLY OF THE AREA YOU WISH TO REFURBISH) when the time comes

The Control of Asbestos Regulations 2012 requires asbestos to be identified and assessed in non-domestic premises. There is an explicit duty on the owner and employer in occupation to manage the risks from asbestos in their premises.
The Regulations also apply to communal areas of purpose-built flats or conversions to flats.

 EWS carry out Management, Refurbishment & Demolition Surveys in accordance with HSE Survey Guide HSG264 and the following Legislation

Why is Asbestos Sampling Important?

Health & Safety Compliance

Asbestos exposure is linked to serious respiratory diseases, including asbestosis and mesothelioma. Identifying and managing asbestos correctly is essential for occupational health and safety.

Legal Requirements

Under the Control of Asbestos Regulations 2012, duty holders must assess and manageasbestos risks in non-domestic properties.

Before Renovation or Demolition

If you plan to renovate, extend, or demolish a building built before 2000, asbestos sampling is a legal and safety requirement.

Peace of Mind

Asbestos sampling provides clarity and reassurance, helping you take the necessary steps for safe management or removal.

Asbestos surveys involve

  1. A pre-survey risk assessment
  2. Inspection for ACMs (asbestos-containing materials)
  3. Sampling of suspect ACMs for laboratory identification
  4. Comprehensive written report and assessments, analysis certificate, marked-up floor plans, photographs etc

EWS Consultants surveys adhere to HSG 264 (a guide to asbestos surveying that places responsibility on both the duty holder and the surveyor).

There are four types of asbestos survey:

1. Management Asbestos Survey (formerly a Type 2 survey)
This is the minimum survey usually carried out within a building and covers the general daily activities likely to occur within a property. Read more about Management Surveys.

2 .Refurbishment Asbestos Survey (formerly a Type 3 survey)
This type of survey is required prior to any refurbishment or ‘significant’ works to a property. ‘Significant’ could mean removing walls, doors, windows etc. or installing new equipment. Read more about Refurbishment Asbestos Surveys.

3. Demolition Asbestos Survey (formerly a Type 3 survey)
This type of survey is required prior to any demolition, this is a full access survey where all areas of the building are inspected. Read more about Demolition Asbestos Surveys.

4. Re-Inspection Asbestos Survey
This type of survey is a follow on from a Asbestos Management Survey and would be used to check the asbestos materials that are left in situ, how often this survey is done is based on the conditions of the asbestos in the building. Read more about Re-Inspection Asbestos Surveys.

Confined space internal tank cleaning and asbestos testing
Confined space internal tank cleaning and asbestos testing
See more
Asbestos Pipe Removal and Replacement
Asbestos Pipe Removal and Replacement
See more
Asbestos Fly-Tip removal
Asbestos Fly-Tip removal
See more
Remove asbestos chrysotile soil pipe and replace with UPVC
Remove asbestos chrysotile soil pipe and replace with UPVC
See more
Removal of Asbestos down pipe
Removal of Asbestos down pipe
See more
Removal of Asbestos Chrysotile lath and plaster ceiling
Removal of Asbestos Chrysotile lath and plaster ceiling
See more
Asbestos sampling
Asbestos sampling
See more
Removal & Disposal of asbestos flooring tiles
Removal & Disposal of asbestos flooring tiles
See more
Asbestos Heating Oil Tank Waste Removal
Asbestos Heating Oil Tank Waste Removal
See more
Asbestos Encapsulated Pipework
Asbestos Encapsulated Pipework
See more
Asbestos door panel removal
Asbestos door panel removal
See more
Asbestos waste pipe removal and installation
Asbestos waste pipe removal and installation
See more